ID 538122

Archived

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase B Project, Atlanta GA

Fulton County

Owner Reference: IFB-C 1200477

Bid Date: 06/17/2020 at 02:00pm

Upper Proctor Creek Capacity Relief Project in Historic Vine City, Phase BConstruction services for installing storm pipes, curb inlets, replacing concrete curbs and sidewalks, pavement repair and resurfacing, and green infrastructure installation. . Construction services for installing storm pipes, curb inlets, replacing concrete curbs and sidewalks, pavement repair and resurfacing, and green infrastructure installation. Coordination with existing utilities and relocating, as necessary. Abandonment of existing utilities including water lines, sewers, storm drains, and appurtenances. Furnishing and installing new utilities and appurtenances, as required. Installing and transferring service connections, where required. Connecting new utilities to existing, where required. Plantings on the Project site. Temporary and permanent erosion and sedimentation control. Right-of-way restoration, including pavement replacement. Environmental remediation of approximately 21,500 tons. Bidders are required to furnish a Bid Guarantee in the amount of five percent (5%) of the total Bid amount. Bidders offering alternative Bids shall provide a guaranty for the largest total Bid amount. The guaranty shall be a bid bond using Form 3, or a certified check. This project encouraged MBE/WBE participation.

City of Atlanta, Georgia

Arkeshia Hamlett
 (404) 865-8757
 Login or create an account To view email

Published 05/05/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.