ID 572280
Archived
Cedar County
Owner Reference: 210219-G05
Bid Date: 02/19/2021 at 10:00am
Estimate: $750K - $1M
(1): Job J7P3299 Route Various Bridge rehabilitation at various locations in various counties in the Southwest District, the total length of improvement being 3.11 miles. (2): Job J7P3360 Route 7 Bridge rehabilitation over Truman Lake, the total length of improvement being 0.4 miles. (3): Job J7S3359 Route 64 Bridge rehabilitation over Lake Pomme de Terre, the total length of improvement being 0.327 miles. Bonds required. Prevailing wages apply. Contract time is 12/1/21.
State of Missouri Department of Transportation MO (MODOT)
Iuesha Wright-Crowder
(817) 222-4641
Login or create an account To view email
Published 01/25/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.