ID 660374
Archived
Dallas County
Owner Reference: CIZ-DWU-21-422
Bid Date: 03/24/2023 at 01:00PM
Pre-Bid: 03/08/2023
Central Wastewater Treatment Plant, Building No. 9 Training Room, 1020 Sargent Road, Dallas, TX 75203
Trades: General Engineering Contractor GEC; Subcontractor Opportunities
This project includes, but is not limited to, replacement of the Peak Flow Basin C concrete liner including demolition, excavation and haul-off, construction of underdrain improvements, basin access road improvements, plugging of the Basin C to A.1 interconnect and all associated improvements. The project also includes installation of scum baffle at Peak Flow Basin B.2 to C spillway, partial or complete removal of the mitigation cell, installation of one new 62 MGD vertical turbine solids handling pump, replacement of the existing influent pump station non-potable water booster pump station seal water piping and associated piping/electrical/instrumentation improvements for the existing six VTSH pumps, construction of slope improvements at the stormwater pond and site drainage channel, removal/demolition of the existing sluice gate/temporary bulkhead plate at Gate Structure No. 2 and replacement with new slide gate and actuator. Bonds required. Prevailing wages.
City of Dallas TX
Procurement & Purchasing
(214) 670-0604
Login or create an account To view email
Published 02/28/2023 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.