ID 607323

Archived

Water Treatment Plant Finished Water & Backwash Pumping Systems Improvements, Sweet Home, OR

Linn County

Bid Date: 12/14/2021 at 02:00pm

Pre-Bid: 12/02/2021
Sweet Home Water Treatment Plant, 1500 47th Ave., Sweet Home, OR 97386

Trades: General Engineering Contractor GEC

Furnishing all labor, superintendence, materials, power, water, tools, equipment and services required Furnishing and installing miscellaneous items incidental to or necessary for completion of the Work, Furnish and install cables from each of the new VFD drives and the Active Harmonic Filter to the new control panel. CP101. Install a new control panel adjacent to existing Siemens control panel, New Backwash Pump: Furnish and install a vertical turbine backwash pump and piping, valves, and appurtenances; Replace existing power conductors feeding MCC602 with 600A rated conductors; Replace existing circuit breaker trip plug in MDP601 with new 600A trip plug. Furnish and install cables connect the backwash pump soft starter MCC section and the backwash pump and piping appurtenances to the new control panel. 170 days

Bonds required. Prevailing wages.

City of Sweet Home, OR

Trish Rice
 (541) 818-8003
 Login or create an account To view email

Published 11/12/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.