ID 567155

Archived

West Tahoe Regional Water Treatment Plant, Tahoe City, CA

Placer County

Owner Reference: 0007

Bid Date: 03/31/2021 at 02:00pm

Pre-Bid: 12/12/2020
https://zoom.us/j/91094047021, phone in: 669-900-6833 zoom id 910 9404 7021.

Estimate: $12,500,000

The work to be performed consists of all labor, material, tools, equipment, services, and incidentals necessary to construct the new 1.0 million gallon per day West Lake Tahoe Regional Water Treatment Plant, which includes, among other work, submersible lake intake pumps; approximately 1,500 linear feet of 10-inch raw water line; approximately 300 linear feet of 36-inch raw water line; raw water lake intake pump station building; water treatment plant building; installation of Owner procured microfiltration and ultra-violet light disinfection systems; construction and installation of chemical feed systems, treated water pump station, above ground treated water clearwell tank, generators, motor control centers, PLC-based control system with a Wonderware SCADA System, associated piping, instrumentation, and electrical work; approximately 1,200 linear feet of 8-inch/12-inch treated water line; site improvements including, but not limited to, site grading, paving, drainage; demolition of existing water treatment facilities; and associated work. Bonds required. Prevailing wages. Q&A due by 01/20/21 at 5PM. DBE goals.

City of Tahoe City. PUD

Cory Allison
 (530) 580-6329
 530.583.1475
 Login or create an account To view email

Published 01/22/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.