ID 561470

Archived

Westside Water Well & Booster Pump Station - Calder Road, League City, TX

Galveston County

Owner Reference: ITB 21-013 / 5070-00

Bid Date: 12/08/2020 at 10:00AM

Pre-Bid: 11/04/2020
Contact Rebecca Hendrix for specifics of the virtual meeting.

The project includes the construction and installation of a 1500gpm water well, a 750,000-gallon Ground Storage Tank, and a Control Building that includes: 4-500gpm Booster Pumps, a Chlorine Feed Room, a Chemical Feed Room and an Electrical Room. The Project location for the new Water Well & Booster Pump Station is along Calder Road to the West between Pearl Hollow Lane and Heather Grove Lane. The plant site is south of Bay Colony Pointe West, Section Six, located in City of League City, Texas. Questions due by Nov 5th. Bonds required. Prevailing wages apply.

City of League City, TX

Rebecca Hendrix
 (713) 527-6429
 Login or create an account To view email

Published 11/04/2020 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.