ID 691519

Archived

Wastewater Treatment Plant & Collection System Improvements, Niland, CA

Imperial County

Owner Reference: Project 6582NSD

Bid Date: 03/01/2024 at 02:00pm

Pre-Bid: 01/25/2024
County of Imperial Public Works Dept Office, 155 S. 11th St, El Centro, CA 92243 (Addendum No 1 changed date to Jan 25th.

Estimate: $6,443,998

Trades: Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Construction of improvements to the Niland County Sanitation District Wastewater Treatment Plant and Collection System Improvements located in Niland, CA along Alcott Road, 2,000 feet west of State Route 111, along with sewer pipelines located along Alcott Rd and State Route 111. The Scope of Work includes, but is not limited to the following: Improvements to the existing influent headworks structure, existing aeration pond liners, existing disinfection system facilities, existing site piping, existing site entrance driveway and existing collection system pipeline; construction of a new effluent pump station, new force main pipeline to three new evaporation-infiltration ponds with a total area of 31 acres, new perimeter fencing, new canal water pipeline and new site specific non-potable water facility. Addendum No 1 changed the bid due date to March 1, 2024. Work to be substantially completed within 336 days and completed and ready for final payment 366 days after the date when the Contract Time commence to run. Federal funds. Bonds required. Prevailing wages.

Niland County Sanitation District
 Adolfo Garcia
 Login or create an account To view email

Published 12/18/2023 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.