ID 699223

Archived

2024 Citywide ADA Ramp & Concrete Repair A, Denver CO

Denver County

Owner Reference: Contract 202472628

Bid Date: 03/14/2024 at 11:00am

Pre-Bid: 02/21/2024
Recommended. To access the meeting, please call (720) 388-6219 and enter conference ID: 629 840 539# or join via Microsoft Teams Link. https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_ODRhOTc4NjAtMDdhZC00ZWJiLTkxMGYtYTg5MzcxMTRkYTk2%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%252239c87ab3-6612-42c0-9620-a696d12df803%2522%252c%2522Oid%2522%253a%2522ae007527-02bc-41d9-bd76-6780f7b8d891%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=32af2bca-9949-4bef-89b2-969492210f35&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

Estimate: $2,250,000 - $2,750,000

Trades: CO-01 - *General Engineering Contractor GEC; Subcontractor Opportunities, CO-12 - Concrete Contractor: Sidewalks, Curbs, Gutters, Driveways, Handicap ADA Ramps. Pedestrian Improvements, CIP Concrete NIGP 913-47

The work will consist of removal of deficient concrete ADA ramps, curbs, gutters, sidewalk panels, valley gutters, concrete streets, and alley pavement. The concrete will be replaced to restore the structure to its original condition. If the asphalt pavement is damaged during construction the surrounding area will be removed and replaced with new asphalt. If landscaping and/or sprinklers are damaged during construction, they will be replaced. SBE goal 30% Bonds required. Prevailing wages.

City & County of Denver CO
 Michaela Martinez
 Login or create an account To view email

Published 03/04/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.