Colorado Gulch Bridge Replacement, Hailey, ID

Blaine County

Owner Reference: 2024-01

Bid Date: 03/21/2024 at 03:00pm

Trades: PWC - *General Engineering Contractor GEC; Subcontractor Opportunities

The proposed Work consists of construction of the Colorado Gulch Pedestrian Bridge. This construction of the bridge will require the removal of the remnant concrete abutments out there now, new poured-inplace concrete abutments set on driven piles, and a steel truss bridge with wood decking that is prefabricated as described in the Project Drawings. The pathway is to be a natural pathway. Improvement/rehabilitation using natural materials like dirt or wood chips on an existing natural pathway that measures approximately 15ft x 450 ft, to access the bridge site, for construction and for pedestrian access after work is completed. The Work shall be completed in accordance with the Contract Documents. The Contractor shall bid the construction of the abutments, approach, and bridge, accordingly. Bid Forms will be provided in the Contract Documents. The project is planned to be completed by September 15, 2024. If this date is not able to be met by contractor, please indicate in submittal. Bonds required.

County of Blaine ID
 Danielle McKee
 Login or create an account To view email

Published 03/06/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.