R2 Paving RFB - OR219 MP22.33-23.36 Inlay Paving, Salem, OR
Scope: Work consists of 3" inlay paving starting at the southern limit of the active paving job (planned to start around June 10th) for the Newberg-Dundee bypass near MP22.33, match existing joints and mix of Newberg project paving. Full width paving heading south and stop at BR08516's northern bridge joint. Only over BR08155 (Hess Creek), switch to a 2" inlay (4.5" existing), no vibratory use when rolling, and be aware that the bridge is load rated for an HS 20 vehicle so plan the paving train accordingly. Saw and seal all affected bridge joints which is incidental per 00744.90. Replace striping to match existing and add two narrow lane reduction arrows at the end of the NB climbing lane.