ID 700521

Archived

2025 SMP Package IV (Bell Drive), San Antonio, TX

Bexar County

Owner Reference: CO-00727-RL

Bid Date: 04/05/2024 at 11:00am

Pre-Bid: 03/25/2024
WebEx Link: https://saws.webex.com/saws/j.php?MTID=mc80bb28f8c2b9cfd9db38db95ad386b8 Meeting Number: 2489 195 9984 Meeting Password: GKtXSqC4Q56 To Join By Phone: +1-469-210-7159 US Toll (Dallas)

Estimate: $2,550,000.00

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera

The construction of approximately 6,430 LF of 6 to 12-inch PVC C-900, 432 LF of 2-inch HDPE DR 9 water mains, and 599 LF of 8-inch sanitary sewer mains via open-cut construction with a construction duration of 240 calendar days. Good Faith Effort. Bonds required. Prevailing wages.

San Antonio Water System (SAWS) TX
 Roxanne Lockhart
 Login or create an account To view email

Published 03/16/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.