ID 699997

Archived

Plum Creek Phase 2, Kyle, TX

Hays County

Owner Reference: Plum Creek Phase 2

Bid Date: 03/21/2024 at 02:00pm

Pre-Bid: 02/22/2024
Link: https://teams.microsoft.com/l/meetup-join/19%3ameeting_OTEwZDZmM2ItYWYwYi00MDJmLThkZTktN2E5NGJiM2VkMzY4%40thread.v2/0?context=%7b%22Tid%22%3a%223c333eac-b334-4f56-bdda-67c16a303878%22%2c%22Oid%22%3a%226a99f1d0-c866-4a3c-9924-db9505ca7bdf%22%7d

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Pavement Marking, Striping, & Reflectors - General Engineering Contractor, Non-Electrical Signs & Signage Contractor: Interior Advertising or Wayfinding, *Landscaping Contractor: Grounds Maintenance Grubbing Fertilizing Sodding Mowing Rooting Mulch Hardscaping Rockscaping, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners

Construction of new road facilities Avenue A, Cromwell, and Heroes Memorial Drive roads (2,600 LF), Signage and Striping, TxDOT driveway connections (2), Back-of-Curb Landscape Improvements, Cultural Trail, Storm Sewer and Collection System (2,200 LF), Sanitary Sewer Infrastructure (1,200 LF), Water Infrastructure (2,700 LF), Dry Utilities – Electric and Telecommunications (2,200 LF), Streetlighting, and Erosion Control Measures as shown on drawings. Bonds required. Prevailing wages.

City of Kyle TX
 Aron Trevizo
 Login or create an account To view email

Published 03/11/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.