ID 700072

Archived

Nathaniel Drive Waterline and Roadway Improvements Project, Pleasant Grove UT

Utah County

Owner Reference: PG202425920

Bid Date: 04/02/2024 at 02:00pm

Trades: E100 - *General Engineering Contractor GEC; Subcontractor Opportunities

East of Murdock Canal Trail: Approximately 3,150 feet of 8” PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes removal and rehabilitation of approximately 12,100 square yards of roadway asphalt and road base. Includes removal and disposal of existing a Pressure Reducing Vault (PRV). West of Murdock Canal Trail: Approximately 2,420 feet of 8” PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes cutting and patching asphalt approximately 1,422 square yards of roadway asphalt and road base. Bonds required.

City of Pleasant Grove UT
 Britton Tveten
 Login or create an account To view email

Published 03/11/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.