ID 696399

Archived

CSO 52 Storage Tunnel and Pump Station, Lynchburg, VA

Lynchburg City County

Owner Reference: 2024-055

Bid Date: 03/28/2024 at 03:00pm

Pre-Bid: 02/28/2024
https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjY0N2I1MGYtOWMxOC00ZGM2LWI0ZWMtYjRhNDVkZTUyZGQz%40thread.v2/0?context=%7b%22Tid%22%3a%22831981f9-34c7-4226-b067-bc3a3a7006fc%22%2c%22Oid%22%3a%2265323fa2-a9a4-44cd-99ad-2d8e847790b9%22%7d

Trades: Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera, *General Engineering Contractor GEC; Subcontractor Opportunities

The CSO 052 Storage Tunnel and Pump Station Project consists of a new CSO tunnel with an internal diameter of 12 feet and length of 4,715 feet (Storage Tunnel); a new upstream diversion and overflow structure (CSO 052) to divert excess flows from the Blackwater Creek Interceptor (BWCI) into the tunnel via a Vortex style drop shaft structure; a new downstream diversion structure to divert excess flows from the James River Interceptor (JRI) to the tunnel via a plunge style drop inside the Pump Station (CSO 134); a new dewatering Pump Station designed to empty the entire tunnel and shaft volume in approximately 24‐36 hours (Pump Station); a new electrical building to house electrical, instrumentation and control components needed to operate the Pump Station; and a new outfall structure to allow discharge flow to Blackwater Creek once maximum storage volume has been reached (CSO 134 Outfall), as well as associated utilities and site restoration. MBE goal 7.4%. Bonds required. Prevailing wages.

City & County of Lynchburg VA
 Stephanie Suter
 Login or create an account To view email

Published 02/06/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.