Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

Browse all King County, WA

#827425

OPEN Pole Replacement Unit Price Contract 3 North of Denny, Seattle, WA

Work under this contract entails the replacement of wood pole assets that are at the end of serviceable life. These poles are rated as P1 and P2 meaning they have a potential of imminent failure. Associated primary conductors and pole equipment such as transformers, switches, services and other appurtenances will be transferred or replaced as part of the replacement work. The Contract duration is for a period of 1 year, starting from the date of Notice to Proceed for the first Work Package issued, or until the date that the total payment requested meets the Not to Exceed award amount, whichever is earlier. Contract time may be extended one additional year upon mutual agreement.

Post Date: 06/03/2026 Bid Date: 06/24/2026 Trades: Pole Installation Repair Contractor
#827426

Seattle Center Monorail Station Reconfiguration Subcontract Bid Package 08.1C Doors, Carpentry, Misc. Furnishing, Seattle, WA

Project Description: Doors, Carpentry, Misc. Furnishing Project Location: Seattle Center Monorail Station. The Seattle Monorail Station Reconfiguration aims to upgrade the existing station to enhance accessibility, operational efficiency and extend the structure and services. The general scope of work includes structural concrete, structural steel, guardrails, transit gates, paint and lead abatement, skylights, fire & life safety, mechanical, electrical, site improvements, earthwork and wet utility upgrades. Structural improvements include repair of corroded steel elements, platform strengthening, guardrail replacement, extension of the canopy structure for increased protection of the landmarked Monorail trains. Throughput improvement includes coordination of new platform edge gates, new ramps, new stairs and new seat walls.

Post Date: 06/03/2026 Bid Date: 06/24/2026 Trades: Framing, Rough Carpentry Contractor & Sheathing
#827427

Seattle Center Monorail Station Reconfiguration Subcontract Bid Package 03.1A CIP Concrete & Topping Assembly, Seattle, WA

Project Description: Cast-In-Place Concrete & Topping Assembly Project Location: Seattle Center Monorail Station. The Seattle Monorail Station Reconfiguration aims to upgrade the existing station to enhance accessibility, operational efficiency and extend the structure and services. The general scope of work includes structural concrete, structural steel, guardrails, transit gates, paint and lead abatement, skylights, fire & life safety, mechanical, electrical, site improvements, earthwork and wet utility upgrades. Structural improvements include repair of corroded steel elements, platform strengthening, guardrail replacement, extension of the canopy structure for increased protection of the landmarked Monorail trains. Throughput improvement includes coordination of new platform edge gates, new ramps, new stairs and new seat walls.

Post Date: 06/03/2026 Bid Date: 06/24/2026 Trades: Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#827428

Seattle Center Monorail Station Reconfiguration Subcontract Bid Package 02.4A Select Demolition, Seattle, WA

The Seattle Monorail Station Reconfiguration aims to upgrade the existing station to enhance accessibility, operational efficiency and extend the structure and services. The general scope of work includes structural concrete, structural steel, guardrails, transit gates, paint and lead abatement, skylights, fire & life safety, mechanical, electrical, site improvements, earthwork and wet utility upgrades. Structural improvements include repair of corroded steel elements, platform strengthening, guardrail replacement, extension of the canopy structure for increased protection of the landmarked Monorail trains. Throughput improvement includes coordination of new platform edge gates, new ramps, new stairs and new seat walls.

Post Date: 06/03/2026 Bid Date: 06/24/2026 Trades: Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling
#824909

Professional Architectural/Engineering Consultant Services for Seattle Animal Shelter Design, Seattle, WA

The City of Seattle Department of Finance and Administrative Services (FAS), Capital Development Division (CD) is initiating planning for a new approximately 50,000 square foot Seattle Animal Shelter (SAS) on City-owned property. The new facility will replace the existing Interbay shelter, which no longer meets operational, capacity, or community needs. The project will create a modern, purpose-built facility that reflects best practices in animal welfare, expands veterinary and community services, and provides a safe, welcoming environment for animals, staff, volunteers, and the public. In addition, site planning will also account for potential co-location of the Seattle Police Departments Canine (K9) Unit, which will require physically separated indoor and outdoor spaces. Through this RFQ, the City seeks an experienced architectural consultant team to lead programming and predesign, refine space requirements, assess site and operational considerations, and support public engagement to establish a strong foundation for future design.

Post Date: 05/19/2026 Bid Date: 06/25/2026 Trades: *A&E Architecture & Engineering: Design Services, Consulting & Planning: Professional, EOR Services, Feasibility Study
#826485

RPBA Replacement - Bellevue College, Bellevue, WA

The Project consists of the installation of an 8 Reduced Pressure Backflow Assembly (RPBA) and enclosure, a 10 RPBA and Enclosure, and electrical service improvements at Bellevue College in Bellevue, Washington. Additive alternates include: Add. Alt. #1: New electrical feeders from switchboard in Building to outdoor panel. Add. Alt. #2: Replacement of the City owned 10 Water meter and vault, including removal of the existing water meter and vault. Scope of work is indicated on the contract drawings and specifications. Voluntary numerical Diverse Business goals of 10% MBE, 6% WBE, 5% SBE or PWSBE, and 5% Veterans have been established for this project. Achievement of the goals is encouraged.

Post Date: 05/29/2026 Bid Date: 06/25/2026 Trades: Plumbing Contractor: Water Supply, Reverse Osmosis (RO), Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic , High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#826782

Genesee Project, Seattle, WA

Two-story childcare and administrative office building with on-site parking and outdoor play.

Post Date: 06/01/2026 Bid Date: 06/30/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#827130

RFP GCCM JAMS Seismic and Misc Improvements Project, Seattle, WA

Seattle Public Schools (district) is requesting statements of qualifications and proposals from General Contractor/Construction Manager (GC/CM) firms to support the districts Capital Projects division to provide preconstruction and construction services for the Jane Addams MS Seismic and Miscellaneous Improvements project identified in the Buildings Excellence (BEX) V Capital Levy and in the Building, Technology, Academics/Athletics (BTA) V Capital Levy.

Post Date: 06/02/2026 Bid Date: 06/30/2026 Trades: *Construction Management; General Contractor CM/CMGC/CMaC: Owner's Representative Services NIGP 925-44
#827148

Luther Burbank Park Waterfront Improvements, Mercer Island, WA

Work to be performed under this contract includes, but is not limited to: Demolition of existing overwater concrete pier structures and removal of creosote-treated timber piles; waterfront plaza soil remediation; and construction of plaza improvements such as rock terraces, ADA-accessible routes, upgraded pavement surfaces, and landscaping. In-water work includes driving small- and large-diameter steel piles; delegated engineering design, manufacturing, and installation of a floating concrete wave attenuator and mooring float; delegated engineering design, manufacturing, and installation of a low-freeboard, floating special purpose dock for non-motorized personal watercraft; steel fabrication of grated overwater piers and gangway abutments supported by steel piles; placement of aluminum ADA compliant gangways to provide float access; nearshore lakebed cleanup; and fiberglass jacketing and grouting of existing creosote-treated timber piles. Additional site work includes construction of fire protection standpipes with associated trenching; trenching for electrical service improvements; irrigation improvements; and improvements to beach access. Requires 15% of all labor hours to be performed by apprentices registered in a State Approved Apprenticeship Program.

Post Date: 06/02/2026 Bid Date: 06/30/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827152

222nd Place Corrosion Control Facility Rehabilitation, Covington, WA

Work includes replacing the onsite hypochlorite generation system including the brine and hypochlorite storage tanks, replacing the hot water tank, installing secondary containment coatings and chemical resistance epoxy flooring, replacing the sodium hydroxide vent and fill piping, replacing butterfly valves, demolishing the unused air piping system and backup hypochlorite feed system.

Post Date: 06/02/2026 Bid Date: 07/01/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827160

Window & Sliding Door Replacement Rebid at Pinewood Village, Bellevue, WA

Work consists of, but is not limited to: a. Removal of existing windows, sliding patio doors, and trim. b. Trim or add material to ensure that windows and sliding patio doors meet wraps and sills. c. Supply and installation of vinyl windows, vinyl sliding patio doors, self-adhesive tape, sealant, trim and metal flashing. d. Paint trim boards to match existing. e. Repair, paint and patch interior window and door wraps and sills. f. Contractor fully responsible for verifying locations, sizes, operational orientation and quantities of all windows and sliding patio doors. KCHA is not responsible for any take-off sizes or orientations. g. Participation in PSE incentive program. Requires documentation of existing metal framed window rough opening sizes and completed some paperwork.
Post Date: 06/02/2026 Bid Date: 07/01/2026 Trades: Glass & Glazing Contractor: Glass Tinting, Glass Door, Window Installations, Repairs & Replacements
#825171

Airport Station Pedestrian Improvement Projec, SeaTac, WA

This Contract provides for the construction of South 176th Street from International Boulevard/SR 99 to 32nd Avenue South; 32nd Avenue South from South 180th Street to South 170th Street; and South 180th Street from 32nd Avenue South to east terminus. Work includes, but is not limited to temporary erosion and water pollution control; removal of structure and obstructions; pavement removal and grinding; installing new stormwater conveyance, detention, and water quality facilities; undergrounding of aerial utilities and constructing joint utility trench; installing water and sewer mains; installation of infrastructure for future electric vehicle charging stations and decorative illumination and traffic signal systems; constructing curb, gutter, planter, sidewalk, bike facilities, retaining walls, raised concrete intersections and crosswalks; road restoration and paving; property restoration; installing of urban design amenities; new channelization and permanent signing, and other work to complete the project, and other work described in the construction documents.

Post Date: 05/20/2026 Bid Date: 07/02/2026 Trades: *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#827421

Medium Voltage Electrical Repair and Maintenance Unit Price 2026, Seattle, WA

The Work includes but is not limited to the following: Contractor to perform replacement, repair and maintenance work on medium voltage systems including medium voltage switch gear, protection relays, fused disconnect switches, busing, metering, service heating systems, and underground infrastructure. This work will require minimum five years of experience and certification for cable splicing and work within the medium voltage substations. The Contractor shall be qualified and possess a minimum of five years of experience in pulling and replacement of medium voltage feeder cable systems. The Contractor shall be qualified to perform other related electrical work as assigned.

Post Date: 06/03/2026 Bid Date: 07/07/2026 Trades: High Voltage Electrical Contractor (HVE): Electrician, Power Lines; Substation, Switchgear, Transmission/Power Lines
#827159

Window & Sliding Door Replacement Rebid at Woodside East, Bellevue, WA

Work consists of, but is not limited to: a. Removal of existing windows, sliding patio doors, and trim. b. Trim or add material to ensure that windows meet wraps and sills. c. Supply and installation of vinyl windows and vinyl sliding patio doors, self-adhesive tape, sealant, trim and metal flashing. d. Paint trim boards to match existing. e. Repair, paint and patch interior window wraps and sills. f. Contractor fully responsible for verifying locations, sizes, operational orientation and quantities of all windows and sliding glass doors. KCHA is not responsible for any take-off sizes or orientations. g. Participation in PSE incentive program. Requires documentation of existing metal framed window rough opening sizes and completed some paperwork.
Post Date: 06/02/2026 Bid Date: 07/08/2026 Trades: Glass & Glazing Contractor: Glass Tinting, Glass Door, Window Installations, Repairs & Replacements
#826354

Replace Carpet Flooring at United States Coast Guard FD&CC, Seattle, WA

Total Small Business Set-Aside, 238330 - Flooring Contractors. The U.S. Coast Guard requires services for the contractor to furnish all labor, tools, equipment, materials, supervision and incidentals for the removal and replacement of carpet tile for the Facilities Design & Construction Center (FD&CC) Seattle offices on the 26th Floor of the Jackson Federal Building, to include the removal and replacement of the rubber wall base.

Post Date: 05/27/2026 Bid Date: 07/10/2026 Trades: Floor Covering and Flooring Contractor, Including Carpet, Wood, Marble, Tile, Ceramic, Linoleum, Vinyl
#827157

Roof & Siding Replacement at Laurelwood Gardens, Federal Way, WA

Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with RCW 49.26.013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 234 sheets of plywood deck sheathing as well as 320LF of fascia board. Provide and install new CDX plywood deck sheathing and roofing materials according to manufacturers recommended installation specifications. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install all new approved roofing system components: a. Install approved Ice and Water shield roof underlayment to all critical areas and valleys. b. Install approved synthetic roof underlayment. c. Install approved composition roofing system. 6. Install Gibraltar Building Products PRV50BL Plastic Roof Vent or approved equal with minimum 50 sq.in Net Free Area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 7. Install Cor-A-Vent IN-Vent Attic Roof Vent or approved equal. Block eave vents after installation. 8. Install all metal 24-gauge flashing components according to manufacturers recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and W-Valley flashing. 9. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 10. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (See Section 1.5 UNIT COSTS for details.) 11. Install new 5 K-style aluminum gutters and 2x3 aluminum downspouts to match existing locations. 12. Removal, disposal and replacement of all siding at rake walls above roof line for buildings N, P, Q, R, S and Rec Room. 13. Removal and replacement of WRB behind siding at rake walls. 14. Installation of all flashings, SAM and penetration gaskets required for a complete siding system at rake walls. 15. Haul away and dispose of all debris and demolished materials. 16. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 17. Daily cleaning and final cleaning of all trash and debris. 18. Prevailing wage rates to be included. 19. Acceptable roofing products must meet these warranty requirements: Contractors workmanship warranty for a period of two (2) years from final completion. Subcontractors labor and materials for a period of two (2) years from final completion. Roofing manufacturers warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturers 40-year warranty for materials. 20. Provide all applicable permits.
Post Date: 06/02/2026 Bid Date: 07/15/2026 Trades: Roofing Contractor, Facia Board & Soffit Replacement, Gutters, Downspouts, Snow Guards
#826557

RFP Solid Waste Transportation and Disposal Services, Seattle, WA

The City of Seattle, through its Seattle Public Utilities, is issuing this Request for Proposals (RFP) to select a contractor to provide long-haul transportation and disposal services for non-recycled Solid Waste generated in the City (residential and nonresidential). The resulting services contract will replace SPUs current longhaul and disposal contract.

Post Date: 05/29/2026 Bid Date: 07/29/2026 Trades: Trucking, Hauling: Dump Truck Services, Relocation of Goods (Including House Moving) & other Freight Services NIGP 962-86, Solid Waste Collection & Waste Management (Non-HAZ): Garbage, Trash Disposal, Recycling, Compacters, Balers NAICS-562111
#803263

2026 Small Works Roster Applications, Snoqualmie Valley, WA

Public School Bid Law, provide that school districts establish a Small Works Roster of qualified contractors who wish to receive bidding information and be considered for performing work on public works projects estimated to cost less than three hundred fifty thousand dollars ($350,000 Including WSST). To be added to the 2026 Small Works Roster please complete the application.

Post Date: 01/10/2026 Bid Date: 12/31/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, All Other Specialty Trades (except foundation, structure, building exteriors, equipment, site prep, Other Specialty Trade: Installing/Servicing/Rebuild of Building Equipment (Excludes Electrical, Plumbing, HVAC equipment)
#806845

2026 Small Works Roster, Snoqualmie, WA

For a Small Works Roster of qualified contractors who wish to receive bidding information and be considered for performing work on public works projects estimated to cost less than three hundred fifty thousand dollars ($350,000 Including WSST). To be added to the 2026 Small Works Roster please complete the application

Post Date: 01/31/2026 Bid Date: 12/31/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors, *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, All Other Specialty Trades (except foundation, structure, building exteriors, equipment, site prep, Other Specialty Trade: Installing/Servicing/Rebuild of Building Equipment (Excludes Electrical, Plumbing, HVAC equipment)
#817988

VRFA Fire Station 38 & VRFA Administrative Headquarters, Auburn & Pacific, WA

VRFA Fire Station 38 portion: the project includes a new two-story Fire Station of approximately 14,960 sq. ft. and associated site and offsite work. The station will be a steel framed structure on deep foundations with (3) full apparatus bays, support spaces, crew workspaces, crew living spaces, and (7) sleeping rooms. The site is approximately 1.16 acres. Site and offsite work includes site structures, storm water systems, utilities, landscaping, paving, frontage improvements, and additional work VRFA Administrative Headquarters portion: The Project includes approximately 18,400 square feet of remodeling (including extensive demolition and repartitioning of spaces) of an existing medical office building. The project includes exterior envelope improvements and site work at the perimeter of the building and at two parking lots plus alternate items. The Owner may issue a single Notice to Proceed or separate Notices to Proceed to commence the VRFA Fire Station 38 and VRFA Administrative Headquarters portions of the Project. The Owner intends for the two portions of the Project to be in construction concurrently during their respective durations.

Post Date: 04/07/2026 Bid Date: 05/05/2026 Trades: *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors