ID 699239
Archived
Kitsap County
Bid Date: 04/04/2024 at 01:00pm
Pre-Bid: 03/15/2024
Time and location will be provided to registered plan holders. Contact Loren Swanson for details
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities
Work consists of relocating existing floats and associated infrastructure at the E&F docks including new and relocated concrete floats; new gangway installation; fuel, fire, water, and electrical utilities; timber pile removal and new steel pile installation. The contract consists of work to be completed within 210 calendar days from NTP. On-site construction shall occur during the 90 day period between Sept 5 and Dec 4, 2024. Bonds required.
Port of Poulsbo WA
Lauren Swanson
Login or create an account To view email
Published 03/04/2024 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.