ID 699482

Archived

Stadium Way Crosswalk Improvements, Pullman, WA

Whitman County

Owner Reference: 2001-2023

Bid Date: 04/03/2024 at 02:00pm

Pre-Bid: 03/21/2024
McCluskey Services Building Room 190D

Estimate: $275,000 – $325,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Install two new crosswalks and signage on Stadium Way near the intersection with College Avenue and near Gannon Hall on the Pullman Campus of Washington State University. Work includes new ADA ramps with tunnel lid modifications, new solar-powered flashing lights and MUTCD signs, and crosswalk striping. At existing crossings, signage and street markings will be removed, two ADA ramps will be filled in and a stair will be removedAlternate 1: Replace existing crosswalk signage with new MUTCD standard signage, including solar-powered flashing beacons and stop bar as shown in C2.6 Alternate 2: Install new traffic island curb, pavement and crosswalk striping as shown in C2.6 enlargement to facilitate pedestrian crossing. Alternate 3: Replace existing crosswalk signage with new MUTCD standard signage, including solar-powered flashing beacons and stop bar as shown in C2.7. Alternate 4: Install new ADA ramps in existing sidewalk at both sides of crosswalk as shown in C2.7. Work to be done at Stadium Way between Main St and College Ave, Pullman, WA. Bonds required. Prevailing wages.

University of Washington State / Washington State University (WSU) WA
 Cynthia Arbour
 Login or create an account To view email

Published 03/05/2024 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.