ID 546705
Archived
Bexar County
Owner Reference: B-20-008-SM
Bid Date: 08/14/2020 at 10:00AM
Pre-Bid: 07/29/2020
Meeting Number: 997 644 487 Password: B-20-008-sm
Audio Connection 210-233-2550 (SAWS WebEx) Access Code:997 644 487
Estimate: $2,760,000
The improvements include: Rehabilitation of a 500,000 gallon welded steel, elevated storage tank, including the surface preparation and repainting of the interior and exterior surfaces; replacement of specified tank appurtenances; surface preparation and painting of a well pump and piping assembly; site grading and paving; chlorine system upgrades; site fencing improvements; yard piping; a new shade canopy; electrical equipment including conductors, control panels, generator connections, permanent generator and SCADA controls; demolition of existing vaults, electrical equipment and other miscellaneous work for a complete in place facility. Bonds required. Prevailing wages.Q&A due by 07/31/20 at 4PM. SMWVB goals.
San Antonio Water System (SAWS), Contracting Office, TX
Stella Manzello
(210) 233-3854
(210) 233-4409
Login or create an account To view email
Published 07/22/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.