ID 568203
Archived
Los Angeles County
Owner Reference: 638-WTR
Bid Date: 02/22/2021 at 11:00AM
Pre-Bid: 01/20/2021
Webcast
Estimate: $1.3 Mil
The work consists of reconstructing the water meter services to replace existing plastic service lines with copper piping, replacing dry barrel fire hydrants with wet barrel hydrants, abandoning existing service laterals, valves, and fittings, relocating fire hydrants, and replacing valves. Also, include abandoning the existing 4-inch cast iron main in Independence Avenue. The construction limits are in the City of South Gate: in Long Beach Boulevard from Tweedy Boulevard to Santa Ana Street, and in Independence Avenue, from Long Beach Boulevard to Victoria Avenue. Prevailing wages. Bonds required.
City of South Gate, Public Works, CA
Chris Castillo
(323) 563-5779
(323) 582-3106
Login or create an account To view email
Published 12/24/2020 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.