ID 568217
Archived
Los Angeles County
Owner Reference: 1121420-0065
Bid Date: 02/02/2021 at 11:00AM
Estimate: $150,000
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and contract documents. The general items of work include complete removal of existing built-up (approximately 16,000 square feet) roofing system and installation of INTEC built up permaglass (in approved equal) roofing system with appurtenances and interior ceiling repairs as described in the special provisions for the buildings at the Aquatic Center (main building, pump house and snack bar). Bonds required. Prevailing wages. Q&A directed to Kevin Periman email: kevinperiman@santafesprings.org or ph. 562-868-0511 xt 3604.
City of Santa Fe Springs, Public Works/Engineering, CA
Vivian DeLeon
(562) 868-0511
(562) 409-7651
Login or create an account To view email
Published 01/11/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.