ID 604403

Archived

Jack Carter Maintenance - Asbestos Abatement Demolition Project, Plano, TX

Collin County

Owner Reference: 022-0022-B

Bid Date: 11/10/2021 at 01:00PM

Pre-Bid: 10/19/2021
Optional Pre-bid; Mandatory Site Visit. Pre-bid is scheduled for Oct 19th @ 9:00AM via Skype conference call - 972-941-5885 conference code 762161. A site visit at City of Jack Carter Maintenance Building 6500 Round Rock Trail, Plano, TX 75023 is mandatory. Site Visits can be scheduled as follows: • October 21, 2021 starting at 9:00 a.m. In order to Must register, space is limited. •If a date/time fills up you will be asked to pick from another available date /time To schedule a site visit use the following: https://www.signupgenius.com/go/4090A4BA9AE2EA1FE3-rfbfor. Also on Oct 27th starting at 2:00 PM.

The purpose of this abatement project will be to professionally and safely remove and dispose of all asbestos-containing linoleum flooring/fiber backing located within the southwest data room (~50-75 sf) prior to demolition of the building. The scope of this abatement project is based upon review of a previous Pre-Demolition Asbestos Survey - Jack Carter Maintenance Building, 6500 Round Rock Trail, Plano, Texas 75023 (EHP Project #200055.22), dated February 25, 2021 (Appendix B). The asbestos abatement portion of the project will require no more than one (1) work shift to complete. The areas requiring specific asbestos abatement are described in Section 3.4 and Figures of the specification. The scope of this project will also include the complete structural demolition of the Jack Carter Maintenance Building and related foundation and paving. Demolition activities will be completed subsequent to abatement completion, and will be subject to all applicable local, state, and federal regulations pertaining to pre-demolition documentation, field operations, erosion control, and related compliance items. Questions are due no later than 12:00 PM on Nov 1st. 

City of Plano, TX

Nancy Corwin
 (972) 941-7120
 (972) 941-0318
 Login or create an account To view email

Published 10/16/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.