ID 607392
Archived
New Madrid County
Owner Reference: 211217-H06
Bid Date: 12/17/2021 at 11:00am
Estimate: $2.5M to $5M
Trades: General Engineering Contractor GEC
Job J9S3560 Route 162 New Madrid County. Bridge Replacement over Drainage Ditches 1 & 251, the total length of improvement being 0.242 miles. (2): Job J9S3562 Route 162 New Madrid County. Culvert replacement over Drainage Ditch 62, the total length of improvement being 0.057 miles. If more than one Job Number is listed for this call, then combination bids will be required on the Jobs listed above. DBE goal is 3%.
Bonds required. Prevailing wages.State of Missouri Department of Transportation MO (MODOT)
Design Division - Central Office
(573) 751-2876
(573) 522-2281
Published 11/12/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.