ID 609647
Archived
Coconino County
Owner Reference: F029601C, A89-B(224)T
Bid Date: 01/14/2022 at 11:00am
Estimate: $4,800,000
Trades: General Engineering Contractor GEC
The proposed project is located in Coconino County on SR 89A between mileposts 402.05 and 403.05 and on I-40B between mileposts 195.48 and 195.86. The work consists of removing the existing asphaltic concrete by milling and replacing it with new asphaltic concrete. Additional work includes removing and replacing existing curb and gutter, sidewalk, driveway, pavement markings, and other related work. The time allowed for the completion of the work included in this contract will be 150 working days. Prequalification required. DBE goal is 5.68%.
Bonds required. Prevailing wages.State of Arizona Department of Transportation AZ (AZDOT)
Iqbal Hossain
(602) 712-4398
Published 12/02/2021 on Construction Bid Source
DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.