ID 629422

Archived

Weir Canyon Road Rehabilitation, Anaheim, CA

Orange County

Owner Reference: RCP No. 2020-17807

Bid Date: 06/09/2022 at 02:00pm

Trades: A - General Engineering Contractor GEC, C10 - Electrical Contractor - Including Lighting and Possible High Voltage

The City of Anaheim solicits proposals for "Weir Canyon Road Rehabilitation from South City Limits to Parkglen Place (Segment 1) & from Serrano Avenue to Santa Ana Canyon Road (Segment 2). The work consists of cold planning existing asphalt pavement, localized street repairs, placing a layer of Asphalt Rubber Aggregate Membrane (ARAM), and resurfacing the road with an Asphalt Rubber Hot Mix (ARHM) overlay. The work also includes: removal and reconstruction of ADA access ramps, concrete sidewalk, adjusting or reconstruction utility housing to grade, the replacement of traffic striping, traffic detector loops, raised pavement markers, manhole covers, valve covers, and all additional work necessary to properly construct the proposed improvements, in accordance with contract documents. Questions are due by 11:55 PM on June 2nd. Project duration is 80 days. Bonds required. Prevailing wages.

City of Anaheim CA

Jason Thiem
 (714) 765-5100
 Login or create an account To view email

Published 05/19/2022 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.