ID 603063

Archived

Construction of the Northport 24" Force Main on Glades Cutoff Rd, Port St. Lucie, FL

St. Lucie County

Owner Reference: 20210016

Bid Date: 11/01/2021 at 03:00PM

Pre-Bid: 10/07/2021
City Hall Building A, 3rd Floor Suite 390 - 121 SW Port St. Lucie Blvd, Port St. Lucie, FL 34984

New Construction: The Northport 24” Force Main Project on Glades Cutoff Road in Port St. Lucie consists of a 24” force main that starts at Glades Cutoff Road south of Midway Road near Canal 105. From there it will proceed south to connect with an existing 24” force main on Glades Cutoff Road at the intersection with Commerce Centre Parkway. The project includes approximately 8,240 linear feet of 24” main, two 24” x 16” stub-outs for future connections, a 24” x 24” stub-out for a future connection, 24” line stops, 24” tapping sleeve and valve, 24” plug valves, air release valves, piping fittings, replacement of sidewalks, roads and restoration of sod, and all other necessary appurtenances. It also includes a directional bore of 1,790 linear feet under Interstate Highway I-95.

Bonds required. Prevailing wages.

Port of St. Lucie FL

Shelby Dolan
 (772) 344-4068

Published 10/04/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.