ID 603200

Archived

Phase 1 Water Distribution Pipeline, Vineyard City UT

Utah County

Bid Date: 10/25/2021 at 02:00pm

Prequalified contractors. Prequalification proposals due 10/25/21 by 2:00 pm.  Prequalification documents can be obtained at https://bids.sciquest.com/apps/Router/PublicEvent?CustomerOrg=StateOfUtah.   The Work of this Contract includes the installation of 12-inch, 16-inch, 24-inch, 30-inch, and 36-inch DR-18 C-900 PVC piping, valves, and appurtenances; installation of 28-inch steel 
casing and 20-inch DR-11 HDPE carrier pipe by means of jacking and boring; installation of 36-inch steel 
casing and 28-inch DR-11 HDPE carrier pipe by means of jacking and boring; installation of 24-inch RCP; 
construction of a concrete headwall; crossing of UTA and UPRR railroad tracks at three locations - two by 
means of jacking and boring, and one through an existing concrete tunnel; water service connections; 
installation of new fire hydrants; removal of existing concrete vaults and their associated piping, valves, 
and appurtenances; and capping and abandoning existing waterlines

City of Vineyard, Utah

Kinsall McDermott
 (801) 226-1929
 Login or create an account To view email

Published 10/05/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.