ID 604483

Archived

Sierra Conservation Center Vinyl Flooring Installation and Repair, Jamestown, CA

Tuolumne County

Owner Reference: C5610455-D

Bid Date: 12/01/2021 at 11:00am

Pre-Bid: 11/09/2021
Intent to participate & Gate Clearance due 10/27/21. Bidders and/or their representative(s) planning to attend the bidders’ conference and/or walk-through held on institution grounds must provide their driver's license or DMV identification card number, date of birth, and complete name to secure a Gate Clearance for admittance. Please contact Jack Roll, IWL Construction Supervisor II at (209) 984-3487. Sierra Conservation Center 5100 O’Byrne’s Ferry Road, Jamestown, CA 95327

Estimate: $72,072.00

Trades: Floor Covering and Flooring, Including Carpet, Marble, Tile, Ceramic

Work includes: Provide labor to repair and install approximately 10,000 square feet of new fully welded sheet vinyl flooring with 5” high integral base throughout subproject 2, Main Medical Building Facility A and B, for a complete Vinyl Flooring system that meets or exceeds specifications, subject to approval by IWL Site Supervisor.  Coordinate all preparation and installation of new vinyl flooring at each phase with the IWL Site Supervisor.  Prepare existing concrete slab in accordance with flooring material manufacturer’s recommendations, written instructions and specifications. Floor surface is to be approved by flooring manufacturer’s representative prior to the installation of new vinyl flooring and integral coved base.  Make final reset to existing replacement floor drains, (installation of drains by others) replace tamper resistant fasteners and tying new vinyl flooring into thresholds. Contractor shall install adhesive set transition strips where necessary. All work to be overseen by the IWL Site Supervisor. All work shall be in accordance with the work described herein and with the plans, drawings and specifications attached hereto. In the event of a conflict between the Scope of Work (SOW), plans and specifications, the SOW shall prevail. The Contractor shall be present for all inspections of the vinyl flooring work with the IWL Site Supervisor. Term is 730 Calendar Days from the notice to proceed. DBE preference. Questions due 11/12/21. 

Bonds required. Prevailing wages.

State of California Department of Corrections & Rehabilitation (CDCR) CA

Joseph O'Connor
 (916) 255-5656
 Login or create an account To view email

Published 10/17/2021 on Construction Bid Source

DISCLAIMER: Projects posted by Construction Bid Source contain information that is aggregated daily from multiple sources. It is the individual responsibility of our members to contact the owner directly for purposes of bidding on a project and gaining additional project information. Construction Bid Source does not assume any responsibility for omissions or errors.