Browse all Los Angeles County, CA
Berths 167-169 Phase II Marine Oil Terminal Improvements, Los Angeles, CA
District 12 ADA Curb Ramp Installation and Sidewalk Repair Program, Glendale, CA
Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the project. The work included in the bid is defined in accordance with Specifications No. 4039, Plan No. 1-2119, and Plan No. 2-419. the work generally includes: selective removal and replacement of deteriorated Portland cement concrete pavement; grading and preparation of sub grade; selective removal, repair, and reconstruction of damaged curbs, gutters, sidewalks, driveways, cross gutters, and alley aprons; remodeling of curb drains; curb ramp modification and reconstruction to meet ADA requirements; disposal of all construction debris, including disposal of asphalt and Portland cement concrete pavements, as shown on the Standard Specifications for Public Works Construction (2024 Edition), including all supplements thereto issued prior to bid opening date.
Chet Holifield Park Community Gardens Project, Montebello, CA
The City of Montebello seeks bids from qualified contractors to provide construction services to transform a section of Chet Holifield Park into a functional and accessible community garden by constructing new planters, fencing, irrigation access (hose bibbs), pathways, curb and sidewalk improvements, parking/ADA striping, and related site infrastructurecreating a well-organized space that supports community gardening and public use.
Material Testing & Special Inspection Services, Montebello, CA
The City of Montebello is inviting bids for the labor, materials, tools, and equipment necessary to perform the Material Testing & Special Inspection Services.
Fremont - Playground Turf Installation Infant Toddler Area, Montclair, CA
General Requirements: Contractor shall provide all labor, materials, equipment, tools, hauling, disposal, and incidentals required for a complete and safe installation. Site Preparation: Walk the entire outlined area and identify all trip hazards, depressions, uneven surfaces, and drainage issues. Remove existing surface materials as needed (grass, soil, debris, roots, rocks, etc.). Excavate and regrade the area to create a uniform, level, and safe play surface appropriate for infants and toddlers. Ensure the subgrade is compacted to a stable condition with no soft spots or voids. Base Installation: Install a compacted aggregate base (e.g., Class II road base or equivalent) to achieve proper leveling and drainage. Grade the base to eliminate dips, humps, or transitions that could create tripping hazards. Compact base to manufacturer recommended density. Safety Underlayment: Install a playground rated shock pad underlayment suitable for infant/toddler fall zones and compliant with applicable ASTM standards. Ensure underlayment is installed flush and without gaps, folds, or uneven seams. Turf Installation: Furnish and install playground grade synthetic turf designed for early childhood play environments. Roll out turf, align grain, and trim edges to fit the outlined area. Seam turf sections using manufacturer approved methods and adhesives. Secure turf perimeter to prevent lifting, curling, or displacement. Infill & Grooming: Apply manufacturer approved infill (if required) to achieve proper cushioning, stability, and performance. Groom turf to ensure even distribution and a uniform finished appearance. Final Cleanup & Turnover: Remove all construction debris, excess materials, and waste from the site. Perform a final walkthrough with MAOF representative to confirm: Surface is level and free of trip hazards, Turf is secure and properly installed, and Area is safe for infant/toddler use. Provide manufacturer warranties and maintenance recommendations. Contractor Responsibility Acknowledgment: By submitting a proposal, contractor acknowledges and accepts that: All measurements are estimates and must be independently verified. No additional documentation (plans, photos, drawings, or specifications) will be provided. Contractor is fully responsible for field verification, code compliance, permitting, and installation quality.
Fremont - Wrought Iron Fence w Doors (Installation) - Fencing for Infant Play Yard, Montclair, CA
Installation of 4-Foot Wrought Iron Fence With Doors - Fencing for Infant Play Yard Site Location: 9950 Fremont Ave, Montclair CA 91763 1. Project Description: The contractor shall furnish all labor, materials, equipment, tools, transportation, and incidentals necessary to install a 4-foot-high wrought iron fence with doors along the boundary indicated by the yellow polygon in the provided Google Earth image. 2. Estimated Fence Length Google Earth shows an estimated length of 337 linear feet for the outlined area. This measurement is approximate only and provided for general reference. The contractor is fully responsible for verifying all measurements in the field.
Pony Wall Installation Norwalk, Norwalk, CA
Fremont Infant Classroom Interior Improvements 1,2,4 & 5, Montclair, CA
General Contractor Requirements (Apply to All Classrooms): Contractor must obtain all required plans, engineering, and permits from the City of Montclair and any other applicable authorities, All measurements provided are estimates only. Contractor must perform their own job walk, field verification, and due diligence, No additional plans, drawings, or measurements will be provided beyond this scope and the facility sketch, Contractor is responsible for all labor, materials, equipment, fixtures, hardware, disposal, patching, painting, and full cleanup, Contractor must maintain a clean and safe work area at all times and coordinate all inspections, All electrical work must be performed by a licensed electrician, All plumbing work must be performed by a licensed plumber, and All cabinetry must be securely anchored to studs per childcare safety standards. Classroom 1: New Vanity Sink Installation (Outside Existing Restroom): Work includes: Opening walls as needed to access supply and waste lines, Installing new hot/cold water lines and drain connection, Installing shutoff valves, P trap, and all required fittings, Installing new vanity cabinet, countertop, and faucet, and Patching, texturing, and painting all disturbed surfaces. Construction of New Napping Room (17' x 9'), and Removal of Existing Sink & Cabinet + Installation of New Sink, Cabinets, Refrigerator, Electrical: Demolition & Removal, Installation of New Sink, Cabinets, Refrigerator, and Storage, Electrical Upgrades, Plumbing Connections, Wall & Floor Restoration, and Blackout Curtains for Napping Area. Classroom 2: Replace Existing Vanity Sink. Classroom 4: Install New Vanity Sink.
FY2026 Street Rehabilitation Project, West Hollywood, CA
AJ Annex Restroom & Locker Room Renovations Phase 1, Whittier, CA
Rio Hondo Community College is inviting bids for the labor, materials, tools, and equipment necessary to complete the AJ Annex Restroom & Locker Room Renovations Phase 1.
RFQ Angeles National Forest Bear Divide Pavin, Arcadia, CA
Janitorial Services, Monrovia, CA
Lenawee Avenue Storm Drain Trenchless Repair, Culver City, CA
Surfacing and PIP Installation- Acosta, Soledad, CA
Citywide Striping, Montebello, CA
The City of Montebello is seeking proposals from qualified contractors or firms to provide on-call annual street striping, pavement marking, and roadway legend services throughout the City. This initiative aims to ensure the Citys approximately 142 miles of public streets are clearly marked and maintained in compliance with traffic safety standards. The selected contractor will assist the City in preserving roadway safety, enhancing visibility of traffic control markings, and maintaining consistency with applicable federal, state, and local standards. In addition to routine striping and maintenance, the selected contractor will perform installation, repair, and replacement of traffic lane markings, crosswalks, stop bars, directional arrows, and other roadway legends. The contractor will also ensure that all work is performed in compliance with City standards, approved plans, and applicable federal, state, and local traffic safety regulations, while coordinating schedules to minimize disruption to traffic and ensure public safety.
NEW BID DATE: Design-Build Services - Dymally Institute Building Project, Dominguez Hills, CA
The State of California, acting through the Board of Trustees of The California State University, hereinafter called Trustees or BOT, on behalf of California State University, Dominguez Hills, hereinafter called University, is seeking proposals from Design-Builders (Proposers) to provide pre-construction and construction services for the project. The Project generally consists of: New Construction of 8000 SF CMU Building for the Marvyn M. Dymally African American Political & Economic Institute (MDAAPEI), located adjacent to the northeast of the CSUDH College of Continuing & Professional Education (CCPE) and the Orthotics and Prosthetics (O&P) buildings. The new Dymally Institute includes gallery, offices, conference room, auditorium, courtyard, and various support spaces. Pre-qualification required. Pre-qualification applications due by April 7, 2026 at 5:00pm
Mark Taper Line of Sight Tenant Improvements, Los Angeles, CA
SOURCES SOUGHT Radar Operations and Maintenance Facility, Los Angeles, CA
Environmental Consultant and/or Project Management Services - Royal oaks Garden Project, BRadbury, CA
The City of Bradbury is seeking proposals from qualified firms for an environmental consultant and/or project management services relating to the development of a 17-lot subdivision located at 1527 & 1533 Royal Oaks Drive North in the City of Bradbury. The project is being proposed by Sunrise Real Estate in Arcadia. The City is seeking services for both Project Management and Environmental Consultant. The City may select separate consultants to provide the two tasks and interested firms may respond to one or both portions of the RFP.