Pump Station No. 4 – Trash Rack Repairs, Chalmette, LA
This project consists of furnishing all supervision, labor, equipment, and materials necessary to Repair Trash Racks and Rakes at Pump Station No. 4.
Need an account?
Remembered your password?
Already have an account?
This project consists of furnishing all supervision, labor, equipment, and materials necessary to Repair Trash Racks and Rakes at Pump Station No. 4.
Install Steel Sheet Piles and Relocate Existing Flap Gates at Lakewood Pump Station
This project consists of road repair work throughout the City of Central as shown in the construction plans and as required by the City on various roadways throughout the City Limits. Construction work generally includes asphaltic concrete, cold planing, pavement patching, temporary traffic control, and other necessary items as shown on the plans & specifications.
The project consists of the rehabilitation of three (3) existing, rock breakwater segments in Grand Isle, LA totaling approximately 6,210 linear feet to EL
The Contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the project, including but not limited to: Saw cut and remove existing concrete slabs at each valve location. Excavate to expose the existing 6-inch piping. Furnish and install four (4) new 6-inch flanged, gear-operated plug valves suitable for buried service. Install operating stem extensions with above-grade valve position indicators. Remove and properly dispose of the existing valves. Backfill and compact excavations. Restore concrete pavement to match existing conditions. Coordinate all work with the Lakefront Management Authority to minimize impacts to fuel farm operations
LA HWY 3127 Widening Utility Relocation Project
Town Center Water Well and I-10 Crossing in the City of Slidell LA
CMAR Project - Fourth Floor Buildout - South Tower Expansion
The Shreveport Airport Authority is seeking proposals for qualified vendors for the turnkey supply, delivery, installation, and commissioning of six (6) new passenger boarding under bridge-mounted intergraded/combo Pre-Conditioned Air (PCA) and 400 Hz Ground Power Units (GPU).
LA 3 (Benton Rd) Viking Dr to Hospital Dr.
The scope of work entails construction for the relocation for a new Air Traffic Control Tower at Shreveport Regional Airport. Construction activities include site preparation, demolition, electrical, utilities and lighting.
Total Small Business Set-Aside, 238290 - Other Building Equipment Contractors. The purpose of this requirement is to ensure EOD (Building 7625) is equipped with four (4) fully functional, electrically controlled bay doors. The contractor shall provide all materials, labor, and equipment necessary to replace two (2) interior compound bay doors and repair two (2) exterior bay doors at Building 7625.
Interstate Sweeping in District 02.
Chiller Compressor Replacements.