SOURCES SOUGHT Berlin Lake Sewer Treatment Plant Replacement, Berlin Center, OH

Mahoning County

Owner Reference: W911WN24SS8016

04/26/2024
Past bid date

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

237110 - Water and Sewer Line and Related Structures Construction. Work is to be performed entirely on Government property which consists of a public campground, two USACE field offices, and the existing WWTF. The campground is open annually from mid-May to mid-September, while the two USACE field offices are open year-round. The Government currently operates the existing 30,000 gallon per day (GPD) WWTF year-round and will need continuous access and utility services to do so during the Project. The new prefabricated WWTP is to be constructed adjacent to the existing WWTP. Final conversation to the new prefabricated WWTP is required prior to demolition of the existing WWTP. Bonds required.

Aaron Barr
 Login or create an account
 Login or create an account

Owner: US Department of the Army (USACE) PA

Published 04/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.