Improvements to the Wastewater Treatment Facilities, Pinewood SC

Richland County

Bid Date: 05/30/2024 at 02:00pm
14 Days until bid date

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The work to be done consists of furnishing all materials, equipment and labor necessary to provide the treatment plant improvements including but not limited to: replacement of three submersible influent pumps with submersible chopper pumps; new fine screen; replacement of nine floating surface aerators and starter panels, replacement of intermittent sand filter dosing valve and level control; replacement of 6 inch DIP pipe and plug valves between aeration basin and filters; replace top 12 inches of sand in each of three intermittent sand filters; replacement of standby electric power generator; replacement of chlorination/dechlorination gas detector and alarm system; and provide and install manhole locking devices on owner selected manholes in the collection system. DBE articipation Bonds required. Prevailing wages.

Jennifer Ruiz
 Login or create an account
 Login or create an account

Owner: AECOM Technical Services, Inc SC

Published 04/28/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.