Cinder Branch Pump Station and Forcemain, Spartanburg SC

Spartanburg County

Bid Date: 05/28/2024 at 02:00pm
24 Days until bid date

Pre-Bid: 05/14/2024 @ 02:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

Constrution of new 2 stage sewer pump station and construction of approx 21,450 LF of new forcemain. 1. Construction of a new two stage sewer pump station a. Site preparation b. Doghouse style gravity interceptor manhole c. 10 ft diameter, 23 ft deep concrete wetwell d. Duplex submersible pumps, duplex second stage pumps e. Second stage pump building f. Permanent diesel bypass pump g. General electrical 2. Construction of approximately 21,450 linear feet of new sewer forcemain a. Approximately 18,931 linear feet of 12-inch DR14 PVC by trench b. Approximately 1,882 linear feet of 14-inch DR9 HDPE by directional bore, 6 locations c. Approximately 468 linear feet of 10-inch DIP, 18-inch steel casing by jack and bore, 12 locations d. Approximately 29 linear feet of 10-inch DIP, 18-inch steel casing by trench e. Cut and patch driveways f. Bore driveways g. Clearing and grubbing as needed, sediment and erosion control, and restoration

Blake Rodgers (Goldie Associates)
 Login or create an account
 Login or create an account

Owner: City of Spartanburg SC

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.