HT Water Treatment Plant Expansion, Bastrop, TX

Bastrop County

Owner Reference: W07-2301303

Bid Date: 06/05/2024 at 10:00am
16 Days until bid date

Pre-Bid: 05/08/2024 @ 10:00am

Estimate: $8,500,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Tank Construction, Repair & Pressure Washing: Fiberglass, Steel or Concrete Tanks - General Engineering Contractor, Machinery and Pumps Contractor, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Demolition Contractor, Building Moving, Wrecking: General Engineering Contractor or General Building Contractor

The Project includes the following Work: Installation of a 0.5 MG prestressed concrete ground storage tank (GST), 1,600 gpm chlorine feed system and storage building, 1,800 gpm booster pump station, electrical instrumentation, and controls, piping, and site improvements at HT Water Treatment Plant. It also involves the demolition of the existing pump station and treatment facilities at M Water Treatment Plant site upon the commissioning of the HT Site. Bonds required. Prevailing wages.

Emily O'Leary
 Login or create an account
 Login or create an account

Owner: Aqua Water Supply Corporation TX

Published 05/06/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.