BCMUD No. 57, Water, Storm and Paving to Cadence Drive Phase 2, Houston, TX

Brazoria County

Owner Reference: 081-011-131 DST (J) / ROAD (L)

05/14/2024
Past bid date

Pre-Bid: 05/07/2024 @ 01:30pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Earthwork and Paving Contractor, Land Clearing, Path & Trail Construction: General Engineering Contractor

Project scope shall include the installation of approximately 1,250 LF of 8”-12” PVC waterline; 148 LF of 24”-30” RCP storm sewer; 205 LF of 9'x4' RCB storm sewer; and 4,550 SY of 7” concrete paving. Bonds required. Prevailing wages.

EHRA Engineering
 Login or create an account

Owner: Brazoria County MUD57 Municipal Utility District TX

Published 04/29/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.