Coral Haven Street Dedication, Street Dedication 3, and Phase 1A Offsite Utilities - Construction of Water, Sanitary and Drainage Facilities - RE-BID, San Antonio, TX

Brazoria County

Owner Reference: 16759-0010-15

Bid Date: 05/24/2024 at 10:00am
4 Days until bid date

Pre-Bid: 05/17/2024 @ 10:00am

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Utility Contractor

Scope of Work of the Contract includes Water, Sanitary, & Drainage Facilities of Coral Haven Street Dedication, Street Dedication 3, and Phase 1A Offsite Utilities. Bonds required. Prevailing wages.

Darren McAfee
 Login or create an account
 Login or create an account

Owner: Brazoria County MUD82 Municipal Utility District TX

Published 05/07/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.