Browse all Brazos County, TX
Warehouse Order Hydrants and Valves, Bryan, TX
The purpose of this Request for Bid is to purchase water and wastewater repair materials for the City of Bryan Water Warehouse.
William J. Bryan Parkway Waterlines, Bryan, TX
Street Maintenance Repairs Asphalt, Bryan, TX
Warehouse Reorder, Bryan, TX
Stormwater Pipe Repair and Site Restoration, College Station, TX
Traffic Pavement Striping & Marking Services, College Station, TX
Portable toilet rental 2026, Tarleton
TSU Portable Toilet Bid FY26.
Drainage Repairs, College Station, TX
Master Agreement to Provide Fire Alarm Maintenance; Service; Inspection and Testing Services, Galveston, TX
Texas A&M University is seeking to establish an Agreement to provide Fire Alarm Maintenance; Service; Inspection and Testing Services, to be performed on the Texas A&M campus in Galveston, TX.
Targeted Goat Grazing Services - Marine Corps Air Station (MCAS) Miramar, California, College Station, TX
Demolition of a Residential 4 Structures, Bryan, TX
Annual Service Agreement for Electric ROW Tree Trimming and Clearing, College Station, TX
Jones Butler Extension & Roundabout, College Station, TX
Barron Road at Decatur Drive New Traffic Signal, College Station, TX
La Copita Research and Demonstration Ranch Mechanical Brush Clearing, Alice, TX
Reconstruction of Shady Lane Substation, Bryan, TX
Jack Creek Substation Construction Project, Bryan, TX
Purchase of Steel Poles for Tabor Substation - Messer Project, Bryan, TX
The work under these specifications shall include but not necessarily be limited to furnishing transmission line tubular steel structures for the Tabor to Messer 138kV Line & Tabor to Rayburn 69kV Line Project. The poles shall be delivered to the Designated Delivery Location. The term Designated Delivery Location shall mean the structure stake locations or contractor laydown yard, as directed by BTU. It is the responsibility of the construction contractor to coordinate with the steel pole manufacturer on the delivery date and time; however, the delivery schedule accepted by BTU shall govern for purposes of compliance with these specifications, and the Manufacturer shall remain fully responsible for timely delivery regardless of such coordination. Time is a critical element of performance under this Specification, and the delivery schedule shall be strictly adhered to unless modified in writing by BTU.