FBCMUD No. 214 Wastewater Treatment Plant Phase II (Site Work), Houston, TX

Fort Bend County

Owner Reference: 12105-00(SW)

05/07/2024
Past bid date

Pre-Bid: 04/25/2024 @ 02:00pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Fencing Contractor: Heavy Fences, Security Gates, Ornamental Iron - General Engineering Contractor, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

Scope of Project: Site work associated with the installation of a proposed 0.3 MGD prefabricated WWTP (furnished and installed by others in separate construction contract). Work to include but not limited to grubbing, subgrade preparation for proposed prefabricated WWTP and site work, access drive, hydromulch seeding, removal and replacement of fencing, dewatering, ground water control, yard piping and valves, pipe coatings, drainage, swales, grading, excavation and disposal, electrical conduit and wiring, and electrical controls for the proposed WWTP facilities and all appurtenances, Complete In Place. Bonds required. Prevailing wages.

Jason Svatek, PE
 Login or create an account
 Login or create an account

Owner: Fort Bend County MUD214 Municipal Utility District TX

Published 04/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.