FBCMUD No. 214 Wastewater Treatment Plant Phase II (Facility Lease), Houston, TX

Fort Bend County

Owner Reference: 12105-00(FL)

05/07/2024
Past bid date

Pre-Bid: 04/25/2024 @ 02:30pm

Trades: Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, *General Engineering Contractor GEC; Subcontractor Opportunities, Mobile & Prefabricated Buildings, Playgrounds, Modular Units & Structures, Shelters, Portables, Portable Toilets: Setup & Repair, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

Scope of Project: Furnish and install a 0.300 MGD prepackaged steel basin wastewater treatment plant (Site work done under a separate contract). Work to include but not limited to supply of prefabricated WWTP Facility including aeration chambers, clarification unit, disinfection basin, sludge aerobic digester unit (dual stage), air distribution system, walkways, and stairs. Work also to include offloading, positioning and connecting the prefabricated WWTP. Bonds required. Prevailing wages.

Jason Svatek, PE
 Login or create an account
 Login or create an account

Owner: Fort Bend County MUD214 Municipal Utility District TX

Published 04/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.