Proposed Water Distribution, Wastewater Collection and Storm Water Facilities to serve Still Creek Ranch Section Five, Houston, TX

Fort Bend County

Owner Reference: 16-011-05-DST

05/09/2024
Past bid date

Pre-Bid: 05/02/2024 @ 10:00am

Trades: Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners

Project consists of installation of water distribution, sanitary collection, storm sewer system to serve Still Creek Ranch Section Five, which is a residential single-family development consisting of 99 lots and approximately 40.90 acres. Bonds required. Prevailing wages.

c/o Odyssey Engineering Group
 Login or create an account
 Login or create an account

Owner: Fort Bend County MUD162 Municipal Utility District TX

Published 04/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.