ID 705117
Fort Bend County
Owner Reference: 16-011-05-DST
05/09/2024
Past bid date
Pre-Bid: 05/02/2024 @ 10:00am
Trades: Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners
Project consists of installation of water distribution, sanitary collection, storm sewer system to serve Still Creek Ranch Section Five, which is a residential single-family development consisting of 99 lots and approximately 40.90 acres. Bonds required. Prevailing wages.
c/o Odyssey Engineering Group
Login or create an account
Login or create an account
Owner: Fort Bend County MUD162 Municipal Utility District TX
Published 04/24/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.