GCA Blackhawk Regional Wastewater Treatment Facility Aeration Improvements, Houston, TX

Galveston County

Owner Reference: Blackhawk Aeration Improvements

04/19/2024
Past bid date

Pre-Bid: 03/19/2024 @ 01:30pm

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Wastewater Treatment Plant Construction & Repairs WWTP/OSSF OnSite Sewer Facilities Lift Station-General Engineering Contractor, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera

This project includes the replacement of the aeration system including blowers and air piping for Aeration basins, digester blower replacement, RAS pump station improvements, improved RAS mixing within the headworks structure, BFP filtrate pump replacement and gravity thickener supernatant pump replacements. This includes equipment procurement and installation, yard piping, site preparation, electrical, instrumentation and controls, and related work necessary to install a complete, working system. Bonds required. Prevailing wages.

Jennifer Harrison
 Login or create an account
 Login or create an account

Owner: Gulf Coast Water Authority TX

Published 03/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.