East Main Lift Station Conversion and Rehabilitation, League City, TX

Galveston County

Owner Reference: 23-054

Bid Date: 05/14/2024 at 02:00pm
10 Days until bid date

Pre-Bid: 04/23/2024 @ 10:00am

Estimate: $2,100,000.00

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Machinery and Pumps Contractor, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera, Controllers, Process & Data Automation: Hardware/Software on High-Level Machinery, Supervisory Control & Data Acquisition SCADA, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

The project consists of the conversion of the lift station from a dry-pit configuration to a full wet/well submersible pump configuration including installation of new submersible pumps, piping, valves & associated fittings, pressure blasting and coating of existing & proposed wet well, new access hatches with safety grate; electrical improvements, new electrical service, elevated platform for the proposed electrical equipment, installation of SCADA panel, pump control panel, auto-sensory controls, floats and terminal boxes; together with all related subsidiary and incidental components as shown in the contract documents. Bonds required. Prevailing wages.

Rene Hurtado
 Login or create an account
 Login or create an account

Owner: City of League City TX

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.