ID 701077
Hays County
Owner Reference: 2372-001B
04/10/2024
Past bid date
Pre-Bid: 03/27/2024 @ 02:00pm
Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera, Sanitation System, Sewer Connection & Septic Contractor, OnSite Sewage Facility (OSSF); CIPP liners, Lakes, Streams, Ponds, Reservoirs, Channels, Water Barrier Installation, Wetland Restoration: NAICS 562998
The Village Grove Phase 1 Backbone Infrastructure Public Bid proposal includes approximately: 8,650 LF of minor arterial roadway; 7,420 LF of 12” waterline; 1,160 LF of 8” waterline; 4,920 LF of 8” sanitary sewer gravity; 3,370 LF of 6” sanitary sewer force main; five water quality/detention pond facilities; and Ranch Road 12 improvements. Bonds required. Prevailing wages.
Meranda Perkins
Login or create an account
Login or create an account
Owner: Dripping Springs MUD1 Municipal Utility District TX
Published 03/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.