Second St, Drake St, and Foster St Reconstruction Project, Caddo Mills, TX

Hunt County

Owner Reference: D007885.001

04/02/2024
Past bid date

Estimate: 4,500,000.00

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities, Highway, Roads, Parking Lot, Bridge, Dam, Overpass, Runways: Road Improvement/Pavement/Resurface - NAICS 237310, Earthwork and Paving Contractor, Land Clearing, Trail Construction: General Engineering Contractor, Plumbing Contractor: Water Supply, Water Heaters, Water Meters, Leak Detection, Flow & Backflow, Acoustic Testing, Excavation & Grading Contractor, Trenching, Backfill, Digging, Ditching, Rock Stabilization - General Engineering Contractor, Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; Includes Pipe Inspection Camera

Construction of a Second Street, Drake Street, and Foster Street Reconstruction Project. Earthwork, Seeding, Waterline installation, Structural Excavating, Backfilling, Compacting, Sanitary Sewer Force Main Pipes and Fittings, Wastewater valves, Sewer line construction, Concrete, Trench Excavation Safety Systems. Bonds required. Prevailing wages.

Shelby Smith
 Login or create an account
 Login or create an account

Owner: City of Caddo Mills TX

Published 03/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.