Cross Drainage Structure Repair, FM1701, Red River & Lamar Cos., TX

Red River County

Owner Reference: 6453-47-001

04/04/2024
Past bid date

Estimate: $863,800.80

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The purpose of this contract is to extend or replace cross culverts in the Paris District. This work includes extending box culverts, removing existing cross structures, placing precast box culverts, safety end treatments, wingwalls, and riprap stone protection. The intent of this contract is to perform approximately half of the work before August 31st, 2024 and the remainder of the work thereafter. Bonds required. Prevailing wages.

Daniel Taylor
 Login or create an account
 Login or create an account

Owner: Texas Department of Transportation DOT ML Austin HQ, Austin TX

Published 03/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.