SMCRWWTP Project #525 - Bid Package 5 Headworks No. 2 & PWWFSB No. 1 Construction, Wylie, TX

Rockwall County

Owner Reference: 221140-Bid Package 5

Bid Date: 05/14/2024 at 02:00pm
6 Days until bid date

Pre-Bid: 04/25/2024 @ 09:00am

Estimate: $92,500,000

Trades: *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities, *General Engineering Contractor GEC; Subcontractor Opportunities, Pipeline Contractor: Water Mains, Sewers, Drains & Pipe Laying + Related Structures; Includes Pipe Inspection Camera

Construction of a new Headworks facility and Peak Wet Weather Flow Storage Basin at the South Mesquite Creek Regional Wastewater Treatment Facility for North Texas Municipal Water District. Detailed scope of work is included in the bid package documents but contains at a minimum: Construction of a new Headworks. Screens Facility. Screening and Grit Handling Facilities. Container Area. Grit Removal Chambers and Grit Pump Basement. Electrical Building and Electrical Room. Multiple Odor Control Facilities. Modifications to Existing Structures. Varying sizes of yard piping, both gravity and force mains. Start-up, Training, and Commissioning of the Project. Bonds required. Prevailing wages.

Johnathan Polak, Walsh Group
 Login or create an account
 Login or create an account

Owner: North Texas MUD Municipal Water District (NTMWD) TX

Published 04/16/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.