Little Bear Creek Recharge Enhancement Facility, Austin, TX

Travis County

Owner Reference: IFB 6100 CLMC1045

Bid Date: 05/23/2024 at 02:00pm
6 Days until bid date

Pre-Bid: 04/23/2024 @ 01:00pm

Estimate: $2,270,778.00

Trades: Roadway Drainage, Stormwater, Manhole Covers & Valve Boxes, Culverts: Installation, Repair & Removal, *General Engineering Contractor GEC; Subcontractor Opportunities

This project would divert a portion stormwater runoff from Little Bear Creek through a diversion channel into the quarry pit where the water would slowly recharge the Edwards Aquifer and help maintain flow at Barton Springs. Bonds required. Prevailing wages.

Babatunde Daramola
 Login or create an account
 Login or create an account

Owner: City of Austin TX

Published 04/22/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.