DWR Ogden Bay WMA Harold Crane Center Levee Repair - 24192520 Standard Low Bid, Hooper UT

Weber County

Owner Reference: MP24033 24192520

Bid Date: 05/14/2024 at 03:00pm
10 Days until bid date

Pre-Bid: 04/24/2024 @ 09:00am

Estimate: $265,000

Trades: E100 - *General Engineering Contractor GEC; Subcontractor Opportunities

Refurbishment of an existing Levee southwest of Willard Bay Reservoir. Mobilization. Site Prep includes Grubbing Levee Prism and Primary Borrow Area Footprint. Compacted Fill Includes 20% Surcharge for Shrinkage (9,190 Cy * 20% = 11,028 CY) 11, 028 CY / 2,258 Linear Feet = ±4.89 CY/LF Compacted Fill. Gravel Surfacing Consists of 3" depth of 1 1/2" Minus Crushed Gravel (209 CY = +/- 300 Ton). Demo existing WCS and pipe. Owner will provide but contractor to install 24" HDPE Pipe. Owner to Provide Briggs Box - Install Only. Bonds required. Prevailing wages.

Tim Christensen, via email only
 Login or create an account
 Login or create an account

Owner: State of Utah Division of Facilities Construction & Management (DFCM) UT

Published 04/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.