ID 704195
King County
Bid Date: 05/08/2024 at 02:00pm
5 Days until bid date
Pre-Bid: 05/01/2024 @ 02:00pm
Trades: Boiler Hot Water Steam Fitting Installation Contractor and Controls, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities
The Kent School District wishes to contract for the replacement of the existing boiler at Meadow Ridge Elementary with a two-boiler system installed with necessary appurtenances, piping and electrical reconfigurations. Alternate #1 includes the replacement of two existing condenser water building pumps with two new like pumps, appurtenances and electrical.
Brett Scribner, email only
Login or create an account
Login or create an account
Owner: Kent School District WA
Published 04/17/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.