2024 Residential Sidewalk Repair Program, Ellensburg, WA

Kittitas County

Owner Reference: Proj 24-022, Bid 2024-01

04/09/2024
Past bid date

Estimate: $225,000 - $375,000

Trades: *General Engineering Contractor GEC; Subcontractor Opportunities

The project consists of furnishing all labor, materials, equipment, and other miscellaneous items to remove existing sidewalk, curb and gutter, pavement, subgrade; prep subgrade, place and compact top course, construct cement concrete curb, gutter, sidewalk; curb ramps, and drive approaches; install asphalt. Schedule "B" requires the furnishing of all labor, materials, equipment, and other miscellaneous items for transit stop improvements. Schedule "C" and "D" are the City of Ellensburg's street related concrete work and utility related concrete work respectively, and shall be used throughout the year on an as needed basis. The Bid Additive requires the furnishing of all labor, materials, equipment, and other miscellaneous items to remove existing sidewalk, curb and gutter, pavement, subgrade; prep subgrade, place and compact top course, construct cement concrete curb, gutter, sidewalk, curb ramps, and construct drive approaches; install asphalt; completing one half block of Alder Street. Bonds required. Prevailing wages.

Public Works
 Login or create an account

Owner: City of Ellensburg WA

Published 03/19/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.