RFP Install Pump House Ventilation System at Chief Joseph Hatchery, Bridgeport, WA

Okanogan County

04/12/2024
Past bid date

Pre-Bid: 04/04/2024 @ 10:00am

Trades: HVAC Contractor: Heating Ventilating Air Conditioning & Controls, Air Handler/Air Chillers. Includes RTU's, *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

Scope of Work to Install Pump House Ventilation System at Chief Joseph Hatchery.  Cut, frame, trim and paint all building openings required for installation.  Provide and install 1-greenheck fan, motorized damper, and exhaust louver.  Provide and install 2-motorized 22x20 intake louver/damper.  Provide and install all electrical wiring, rigid conduit, 20-amp breaker switch, line voltage cooling thermostat as needed to power the system.  Start and verify correct operation. TERO applies. Prevailing wages.

Matthew McDaniel, email only
 Login or create an account
 Login or create an account

Owner: Confederated Tribes of the Colville Indian Reservation WA

Published 03/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.